Maximizing Rail Performance: How Material Requirements Planning Optimization Shapes the Future of Operational Efficiency at PT KAI, Bandung

Authors

  • Adhie Fasha Nurhadian Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Galih Putra Prawiranegara Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Irena Larashati Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Windi Matsuko Danasasmita Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Indri Ayu Tansar Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Asep Rochyadi Suherman Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Ashila Dwiyanisa Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Muhammad Nuin Hayat Pajar Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Ghina Ananda Rhamadanty Yanuar Priadi Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Patwa Wandiandi Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Fitri Putri Sobari Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author
  • Amelia Shaky Andara Sekolah Tinggi Ilmu Ekonomi Pasundan, Bandung Author

DOI:

https://doi.org/10.56447/jpmbistek.v2i2.09

Keywords:

Operational Efficiency, Material Requirements Planning (MRP), Inventory Management, Railway Maintenance

Abstract

This paper addresses the operational challenges at PT KAI, Bandung, where fragmented material tracking and inefficient inventory scheduling frequently lead to maintenance delays and inflated holding costs for critical railway spare parts. To resolve these issues, this joint research and community service project aims to optimize the Material Requirements Planning (MRP) system, thereby accelerating operational efficiency and safeguarding schedule punctuality. We adopted a qualitative research design, deploying a collaborative team of university lecturers and students to conduct in-depth interviews, field observations, and document analyses. We analyzed the qualitative data using thematic analysis and process mapping to evaluate how the optimized MRP framework impacts daily maintenance workflows. The results demonstrate that optimizing the MRP system drastically eliminates redundant inventory, shortens lead times for critical maintenance components, and significantly reduces operational waste. By establishing an integrated, data-driven scheduling workflow, PT KAI successfully minimized maintenance downtime and stabilized its supply chain.

Downloads

Published

2025-10-27

How to Cite

Nurhadian, A. F., Prawiranegara, G. P., Larashati, I., Danasasmita, W. M., Tansar, I. A., Suherman, A. R., Dwiyanisa, A., Pajar, M. N. H., Priadi, G. A. R. Y., Wandiandi, P., Sobari, F. P., & Andara, A. S. (2025). Maximizing Rail Performance: How Material Requirements Planning Optimization Shapes the Future of Operational Efficiency at PT KAI, Bandung. Jurnal Pengabdian Masyarakat: Bisnis Dan Iptek (JPMBISTEK), 2(2), 145-153. https://doi.org/10.56447/jpmbistek.v2i2.09